20180108 Stones access dykes - PDF Flipbook
20180108 Stones access dykes
108 Views
6 Downloads
PDF 248,292 Bytes
PC(curved)Yard1
WC (for CRIEE)
Side Closing9.000 Criée Bloc administratif Side Closing
Dyke (West) 浄化槽 Dyke (East)
5.500Groin Access B
(N & S)
Seawall Center
Access
B B
Idling Quay Access
B Seawall Access
Port Entrance Seawall Access
Groin Access
(E & W)
A
Main Breakwater Stone 30-200kg Gravel 0-200mm
Outside Temporary Sand bag thk = 300mm
Dyke +4.00 CDL
±0.00 1:1.5 10.000 1.50 CDL
A 10.000
26.500
8.250 8.250
Gravel 0-200mm
thk = 300mm
Stone 300-500kg 5.000 3.400 10.800 Section B-B
+4.50 CDL
1:1.3 +4.50 CDL (Conc Parapet) Typical Temporary Access
±0.00 +3.00 CDL (Sheet Pile)
1:1.5
4.50 CDL
11.700 5.000 11.700
28.400
2.000 10.000 9.050
Section A-A
Main Breakwater
Outside Temp Dyke
Data Loading...